Al-Beltagy said, in an interview with Al Arabiya Business, that the grant, which is scheduled to be signed at the beginning of the third quarter of the year, will be disbursed over a period of between 3 and 4 years, ensuring the development of the infrastructure of electricity transmission networks and raising their operational efficiency.
The head of the Transport, Energy and Climate Sector at the European Union delegation to Egypt confirmed that the Union is currently conducting feasibility studies to develop 8 control centers for electricity distribution in Egypt in preparation for financing them with European grants, to accelerate the pace of transformation in the energy mix.